Featured project · Dallas

14-story hotel remodel

An occupied high-rise hospitality renovation — the job that shows how Texas Peak runs complicated work.

In progress

A hotel that cannot close

Texas Peak is remodeling a 14-floor hotel in Dallas. The property stays open. That single sentence is the whole constraint: materials have to move without blocking check-in, demolition has to happen in windows the night audit can live with, and every finished room has to be guest-ready — not “almost.”

Hospitality work is where commercial construction, interiors, and customer service meet. We treat it that way. Owners and property managers get one point of contact, a floor-by-floor plan, and a crew that understands a traveler does not care that we are “in phase two.”

Photos from this job will be added as floors close. If you have a hotel, extended stay, or similar occupied high-rise, this is the work we want more of.

Hotel & hospitality services

How a 14-floor remodel actually runs

Protect the house

Dust walls, floor protection, elevator pads, and a logistics plan so guests never walk through a demolition zone.

Corridor and life safety

Rated assemblies, exits, and finishes that have to look finished while the next floor is still in progress.

Guest-room packages

Repeatable room renovations — bath, finishes, lighting, FF&E — so floor 14 matches floor 3.

Public space

Lobby, breakfast, and back-of-house work scheduled around arrivals, not the other way around.

Hotel corridor renovationHotel public space

Sherman to DFW

Have a hospitality job in DFW?

We are already on a 14-story hotel. If you have rooms, corridors, or a lobby that has to stay open, talk to us.

CallEstimate